• Washing and cleaning with 600 bar and 2500 bar high-pressure washers, industrial water vacuum cleaners. 
  • 1 m3 plastic tank park for storing and transporting hazardous materials. 
  • Safety equipment for carrying out the work: fresh air system operated by an external compressor, chemical protective clothing and protective gloves, 15-liter oxygen bottles for safe exit of the tank in case of emergency shutdown. 
  • All of our employees have the necessary entrance exams to perform their work professionally. 
  • Final inspection of the washing and cleaning performed and documentation of the work processes in the quality assurance system.

 Inspection of tank body, detection of defects. 

  • Repair of tank body defects, execution of locksmith and welding works. 
  •  Inspection of tinned surfaces, detection of defects. 
  •  Re-plating of defective tinned surfaces. 
  •  Inspection of gratings and ladders, detection of errors. 
  •  Repairing defects in walkways and ladders, and carrying out locksmith and welding works. 
  •  Inspection of anti-theft elements, detection of faults. 
  •  Pre-production, repair and welding of faulty, missing anti-theft elements.
  •   Final inspection of completed work and documentation of work processes in the quality assurance system.
  •  Revision of tank wagon fasteners, detection of rust defects and missing elements. 
  •  Dimensioning of replacement fasteners with the appropriate certified measuring instruments. 
  •  List of replacement fasteners. 
  •  Removal of worn fasteners without damaging painted and rubberized surfaces. 
  •  Inclusion of the new fasteners (Acid-resistant A2, A4, galvanized 5.6, 8.8) in accordance with the requirements of the partners from the Kanban screw system established in the area. 
  •  Installation of the new fasteners with the certified tools, tightened to the specified torques. 
  •  Final inspection of installed screws and documentation of work processes in the quality assurance system.
  • Inspection of the rubberized surfaces of the tank wagon, detection of cracks, defects due to wear and tear of the rubber, missing rubber surfaces. 
  •  Re-rubbering the interior of the complete tank wagon according to the partner’s request. 
  •  Re-rubbering of tanker parts, which can be: Dome covers, submersible pipes, valve seat, DN150 submersible stubs, DN600 manholes, DN50, DN80, DN150 blind flanges, dome cover risers (extensions), valve stems, valve stem operating covers, lower drains, T period
  •  Fully rubberization of newly manufactured tank wagon
  •  Final inspection of rubberizing works and documentation of work processes in the quality assurance system.
  •  Inspection of the painted surfaces of tank wagon, detection of corrosion defects, pitting and wear. 
  •  Repainting of the complete tank car according to the partner’s request. 
  •  Surface treatment of tanker parts with sandblasting (granite sand), which can be the following: Dome covers, submersible pipes, DN50, DN80, DN150 blind flanges, dome cover risers (extensions), valve stem operating covers, bottom drains, T branches, central valve, valve seat, tilting cover, rescuers. 
  •  The tanker parts that need to be painted are painted with special paints prescribed by the partners, which can be the following: Dome covers, submersible pipes, DN50, DN80, DN150 blind flanges, dome cover risers (extensions), valve stem operating covers, bottom drains, T branches, central valve, valve seat, tilting cover, rescuers.
  •   Final inspection of painting works and documentation of work processes in the quality assurance system.
  • Inspection of the tank wagon, detection of worn and missing inscriptions, stickers, signs and expired exam dates. 
  •  Production of the required stickers, painting templates, and signs as required. 
  •  Sticking and installing the new stickers, painting templates, signs, and painting the exam marks using templates. 
  •  Final inspection of stickering, labeling and examination mark painting works and documentation of the work processes in the quality assurance system.
  • Tank wagon pressure test with water.  
  •  Tank wagon pressure test with air. 
  •  Final inspection of tank wagon
  •  Documenting the pressure test and final inspection of tank wagon in the quality assurance system.

 IMPORTANT INFORMATION: 

  • The inspection and repair of the chassis superstructures, chassis and wheels of the tank wagon that come to us is carried out by an external partner.